The paper reports the expediency and substantiation of the necessity for the gradual transition to power units on supercritical stream parameters in world power engineering. Basic stages in the development of steam turbine manufacturing with supercritical steam parameters are considered. The parameter increase at the input makes a profound impact upon the design of a flowing part of turbines. To operate a great difference in enthalpies in a cylinder without changing stages number one has to modernize them and sometimes to change the design completely. In the paper there is considered the expediency of the application of axial highloaded stages developed by the Polytechnics of Leningrad (LPI). There are also described the stages of designing steam turbine plants with critical and supercritical steam parameters at the input in a turbine. As an example there is analyzed SKR-100-300 steam turbine with the initial steam parameters of 29.4MPa and 650S. The results of solution computations directed to the efficiency increase of a regulatory stage of K-300-240 steam turbine with supercritical parameters of 580C and 29.0 MPa are presented. The application as a profile of an impeller the blade design of LPI allows increasing turbine plant efficiency in a wide range of mode parameters and also reducing a general number of turbine stages.
steam turbine, initial steam parameters, turbine efficiency factor, adjusting stage, optimization computation, simulator
1. Rassokhin, V.А. Turbines of LTI design: advantages, characteristics, experience in development and realization / V.А.Rassokhin // Scientific-Engineering Gazette of S-PbSPU. - 2011. - № 4 (135). - pp. 41-51.
2. Ivanov, V.А. Multipurpose Autonomous Power Supply Plants / V.А.Ivanov, V.N.Busurin, V.А.Rassokhin // Heat Power Engineering. - 1993. - № 3. - pp. 65-68.
3. Rassokhin, V.А. Principles of flowing parts creation for promising turbines based on LPI profiles with large relative pitch / V.А.Rassokhin, V.N.Sadovnichy, А.К.Shemagin // Abstracts of Reports on the XLIV-th Sc.-Eng. Session on the Problems of Gas Turbines. - М., 1996.
4. Busurin, V.N. Development and optimization of low-power steam turbines of SPU based on economical stages of LPI / V.N.Busurin, V.А.Rassokhin, V.N.Sadovnichy // Abstracts of Reports on the XLV-th Sc.-Eng. Session on the Problems of Gas Turbines. - S-Pb., 1997.
5. Gaev, V.D. Basic directions in steam turbine equipment modernization of OJ-S Co. “Power Machines” at technical renovation of power stations / V.D.Gaev // Conf.-Seminar of RJ-SCo.”SPS” “Innovation Technologies in Power Engineering”: Abstracts of Reports. - М., 2007.
6. Busurin, V.N. High-loaded economical stages of LPI for promising turbine plants / V.N.Busurin, V.A.Rassokhin, V.N.Sadovnichy // Study of Elements in Heat Power Plants: Proceedings. - Bryansk: BSTU, 1999.